Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
Earned Value Management Examples

Life Cycle Outcome Analyzer Views

EVM Analysis

Introduction
This tool generates a variety of life cycle output stock statistics for DevTreks outcomes.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v214a

Version: 1.7.0

Feedback About commercial/outcomegroup/Earned Value Management Examples/37/outcomelcaprogress1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to outcomes.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Earned Value Management Examples
Outcome Group
Earned Value Management Examples
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 08/07/2018 ; Observations: 1; Target :
Ben 996,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
LCB 996,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 996,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.996 mile 1,500,000.00 498,000.00 498,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 0.996 mile 1,500,000.00 498,000.00 498,000.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q1 RR Track Actual(Amount: 0.330; Date: 03/30/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 03/30/2013 ; Observations: 1; Target : actual
Ben 1,000,000.00 4,000,000.00 1,000,000.00 330,000.00 330,000.00 -670,000.00 -670,000.00 33.00 ; 33.00 8.25
LCB 1,000,000.00 4,000,000.00 1,000,000.00 330,000.00 330,000.00 -670,000.00 -670,000.00 33.00 ; 33.00 8.25
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 1,000,000.00 330,000.00 330,000.00 -670,000.00 -670,000.00 33.00 ; 33.00 8.25
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.330 mile 500,000.00 165,000.00 165,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 0.330 mile 500,000.00 165,000.00 165,000.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 165,000.00 LCB: 165,000.00 Unit: 165,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.330 mile 500,000.00 165,000.00 165,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 165,000.00 LCB: 165,000.00 Unit: 165,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 0.330 mile 500,000.00 165,000.00 165,000.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q1 RR Track Planned(Amount: 1.000; Date: 03/30/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 03/30/2013 ; Observations: 1; Target : benchmark
Ben 1,000,000.00 4,000,000.00 1,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
LCB 1,000,000.00 4,000,000.00 1,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 1,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q2 RR Track Actual(Amount: 0.333; Date: 06/30/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 06/30/2013 ; Observations: 1; Target : actual
Ben 1,000,000.00 4,000,000.00 2,000,000.00 333,000.00 663,000.00 -667,000.00 -1,337,000.00 33.30 ; 33.15 16.58
LCB 1,000,000.00 4,000,000.00 2,000,000.00 333,000.00 663,000.00 -667,000.00 -1,337,000.00 33.30 ; 33.15 16.58
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 2,000,000.00 333,000.00 663,000.00 -667,000.00 -1,337,000.00 33.30 ; 33.15 16.58
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.333 mile 500,000.00 166,500.00 166,500.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 0.333 mile 500,000.00 166,500.00 166,500.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 166,500.00 LCB: 166,500.00 Unit: 166,500.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.333 mile 500,000.00 166,500.00 166,500.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 166,500.00 LCB: 166,500.00 Unit: 166,500.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 0.333 mile 500,000.00 166,500.00 166,500.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q2 RR Track Planned(Amount: 1.000; Date: 06/30/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 06/30/2013 ; Observations: 1; Target : benchmark
Ben 1,000,000.00 4,000,000.00 2,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
LCB 1,000,000.00 4,000,000.00 2,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 2,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q3 RR Track Actual(Amount: 0.333; Date: 09/30/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 09/30/2013 ; Observations: 1; Target : actual
Ben 1,000,000.00 4,000,000.00 3,000,000.00 333,000.00 996,000.00 -667,000.00 -2,004,000.00 33.30 ; 33.20 24.90
LCB 1,000,000.00 4,000,000.00 3,000,000.00 333,000.00 996,000.00 -667,000.00 -2,004,000.00 33.30 ; 33.20 24.90
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 3,000,000.00 333,000.00 996,000.00 -667,000.00 -2,004,000.00 33.30 ; 33.20 24.90
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.333 mile 500,000.00 166,500.00 166,500.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 0.333 mile 500,000.00 166,500.00 166,500.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 166,500.00 LCB: 166,500.00 Unit: 166,500.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 0.333 mile 500,000.00 166,500.00 166,500.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 166,500.00 LCB: 166,500.00 Unit: 166,500.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 0.333 mile 500,000.00 166,500.00 166,500.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q3 RR Track Planned(Amount: 1.000; Date: 09/30/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 09/30/2013 ; Observations: 1; Target : benchmark
Ben 1,000,000.00 4,000,000.00 3,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
LCB 1,000,000.00 4,000,000.00 3,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 3,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Outcome
2013, Q4 RR Track Planned(Amount: 1.000; Date: 12/31/2013 Label: A1010
C or B Type Plan Period Plan Full Plan Cumul Actual Period Actual Cumul Actual Period Change Actual Cumul Change Plan P Percent ; Plan C Percent Plan Full Percent
Date : 12/31/2013 ; Observations: 1; Target : benchmark
Ben 1,000,000.00 4,000,000.00 4,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
LCB 1,000,000.00 4,000,000.00 4,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
REAA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
Unit 1,000,000.00 4,000,000.00 4,000,000.00 0.00 0.00 0.00 0.00 0.00 ; 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Output: 2013 RR Track
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
RR Track Installed 1.000 mile 500,000.00 500,000.00 500,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Output: 2013 RR Track Site Prep
Total: 500,000.00 LCB: 500,000.00 Unit: 500,000.00 EAA: 0.00
Description : Sample analysis used in a DevTreks tutorial. v214a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Land 1.000 mile 500,000.00 500,000.00 500,000.00 re01
This subbenefit values the land purchased for a railroad.
Dataset: Earned Value Management Examples IRI This recreation benefit estimate is computed using life cycle cycle totals, statistics, incremental change, and progress outcome analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.